Questo sito utilizza cookie, anche di terze parti. Per maggiori informazioni, leggi l'informativa estesa Cookie Policy.
Chiudendo questo banner, cliccando su un link o proseguendo la navigazione in altra maniera, acconsenti all'uso dei cookie.

Spider Bridge - Tignè Point (Malta) WORKS IN PROGRESS

Enclosed between the directional and residential towers recently built at Tigne Point - Malta, the cycle-pedestrian bridge will join the main square at the seafront in Sliema. This is a fundamental work for the Government of Malta, in order to increase the touristic flows of the area by getting straightforward in the most important areas. The structure is made of metal carpentry frames in HEM 700 and HEA 360 joined together by central trunks and flanged joints bolted. The scaffolding - supported by 3 X-shaped tube columns - will be paved with Iroko's wooden slats and illuminated with dotted diffuser elements. The scope of work of Bertazzon includes everything to give the turnkey product, from structural design to civil work, from metal structures to the plants.
 
Bridge length: 40 meters
Total weight structure: 75 tons

Period of construction: 2017-2018